Tuesday, September 15, 2009

New Theatre completed by Axis Architects

Axis Architects is proud to announce the completion of the Noorda Theatre.



This new black box theatre, on the UVU Campus includes a flexible seating system that can be arranged with the actors in the center with seating on two, three or four sides or as a traditional proscenium. The main theatre has black walls, ceiling and floor. Spectators are much closer to the actors since there is no formal stage and plays can be set quickly. Instead of a traditional catwalk, Axis and Spectrum Engineers designed a state-of-the-art walk-on ceiling grid made of woven stainless steel cables. It allows technicians to adjust lights rapidly and safely above the 17 foot high “net”.



We had great team members on this project, I thank them profusely. They are:UVU: Kathie Debenham, Katherine Farmer, Jim Michaelis, Terry Petrie, Frank YoungThe Noorda familyState of Utah DFCM: Mike AmbreArchitect: Axis Architects, Pierre Langue, Boyd Viehweg, David Anderson, Ryne HawkinsTheatre lighting designer: Jody Good, Spectrum EngineersElectrical Engineer: BNA ConsultingMechanical Engineer: Van Boerum and FrankStructural Engineer: Bsumek Mu Contractor: Keller construction

No comments:

Post a Comment